CONTRACTORS · RISK ENGINE

Contractor Risk Engine

Live contractor risk surfacing across delays, overruns, quality failures, compliance gaps and customer exposure.

6 contractors flagged₦172M exposure · 4 critical risks · live monitoring
Total Risks
38
all severities
Critical
4
exec action
+2 WoW
Delayed Projects
11
> 5 day slip
Budget Overruns
₦84M
5 projects
Contractors Flagged
6
composite < 70
Financial Exposure
₦172M
net at-risk
+₦38M WoW
SEVERITY MIX
Risk severity distribution
Critical risk concentrated in PH Marina, Enugu Skyline, and Abuja Hills.
PROBABILITY × IMPACT
Contractor risk matrix
ESCALATECRITICALMONITORWATCHImpact →Probability →Coastal WorksNiger BuildAtlas InfraLagos BuildNorthgateSahel Construction
Live contractor risk board
Sorted by severity · refreshed every 60s
ContractorEstate / projectTypeSeverityDays behindImpactOwnerRecommended action
Coastal WorksPH Marina drainagedelaycritical18₦42MFemi O.Replace or reassign
Niger Build GroupEnugu Skyline land prepbudgetcritical14₦22MBola A.Freeze payment
Atlas InfraAbuja Hills perimeterdelayhigh12₦18MTunde M.Add crew
Lagos Build Co.Eko Bay roadsqualityhigh6₦14M reworkQA LeadQuality audit
Northgate Eng.Ibeju City powerdelaymedium4₦8MOps LeadMonitor
Sahel ConstructionKuje drainagecompliancemedium2permit gapLegalResolve permit
Atlas InfraKuje Heights drainagecompliancemediumpermit gapLegalFollow-up
Activity Timeline
  1. Coastal Works · escalation to CRITICAL
    1h
    PH Marina drainage now 18 days behind
  2. Niger Build payment placed on hold
    6h
    ₦22M variance · budget explanation required
  3. Atlas Infra requested additional crew
    1d
    Abuja Hills perimeter · +18 workers
  4. Lagos Build Co. QA re-audit dispatched
    2d
    Eko Bay roads · 4 sections flagged
  5. Sahel drainage permit follow-up filed
    3d
    FCT Office · 48h response window
  6. Northgate Ibeju power delay logged
    5d
    IBEDC dependency · escalated
  7. Customer notification plan approved
    7d
    14 PH Marina customers · proactive brief
Risk by estate · category heat
PH Marina · Delay
20
PH Marina · Quality
45
PH Marina · Compliance
60
Enugu · Budget
22
Enugu · Delay
30
Enugu · Supply
55
Abuja Hills · Delay
44
Abuja Hills · Permit
70
Eko Bay · Quality
48
Eko Bay · Budget
74
Kuje · Compliance
62
Kuje · Supply
78
Lekki Pearl · All
88
Ibeju City · All
84
Magodo Vista · Supply
52
Ibadan Crest · Utility
58
Kano Ridge · All
82
Eko Atlantic · Legal
66
FINANCIAL EXPOSURE
Exposure by contractor (₦M)
Two contractors carry ₦64M combined critical exposure — replacement plan reduces net exposure by ~₦46M.
Executive escalations
last 7 days
Coastal Works · PH Marina drainage 18d behind
₦42M exposure · 14 customer escalations queued
2h
Atlas Infra · Abuja Hills perimeter 12d behind
₦18M exposure · sub-contractor dispute
5h
Lagos Build Co. · failed quality audit · Eko Bay
Rework cost ₦8.4M · 4 sections
1d
Niger Build Group · ₦22M budget overrun
Enugu Skyline land prep · explanation pending
2d
Magodo Vista cement shortage · 72h supply gap
Sahel Cement disruption · alternate sourced
3d
Ibadan Crest transformer ETA pushed 8 days
IBEDC dependency · escalated to NERC liaison
4d
Lekki Pearl roads back on schedule
Citadel added two crews · 4 days recovered
6d
Mitigation action board
Suggested by AI risk engine
reassign
Switch PH Marina drainage to Sahel Construction
Save ~8d · +₦3M · CFO approval required
escalate
Suspend Niger Build payments pending review
Protect ₦42M remaining contract value
notify
Brief 14 PH Marina customers proactively
Reduce refund risk ~60% per model
approve
Emergency material purchase · cement (Magodo)
₦18M · secures 21-day supply
dispatch
QA inspection team → Eko Bay roads
4 sections · 48h
legal
Permit intervention · Kuje Heights drainage
FCT liaison · 72h window
AI Risk Diagnosis · 91% confidence
Root cause
Contractor capacity, material availability, and weak milestone verification are driving 67% of current risk.
Delay prediction
PH Marina may slip another 9–12 days without contractor replacement.
Financial impact
Exposure may rise from ₦172M to ₦240M within 30 days.
Recommended intervention
Freeze new allocations for Coastal Works and Niger Build. Reassign PH Marina to Sahel. Executive approval for all milestone payments > ₦25M.
Risk recovery tracker · last 30 days
Executive KPI progression
Delays recovered
on track
6
/ 12
target 12
Risks closed
on track
14
/ 20
target 20
Exposure reduced ₦M
watch
38
/ 60
target ₦60M
Replacement contractors
ready
4
/ 6
ready pool
Cust. escalations prevented
on track
22
/ 30
rolling 30d
Action Queue
4 pending
Executive risk council · Friday 09:00
Chair · CEO
3d
Legal review · Niger Build contract
GC & CFO
48h
Customer comms · PH Marina
Marketing
24h
Insurance claim · Eko Bay rework
Finance
5d