OPERATIONS · INFRASTRUCTURE
Infrastructure grid
Real-time telemetry across 11 estates — power, water, network, security & sensors
Estates Online
11/11
Grid Load · now
2.84 MW
Solar Yield · today
1.12 MWh
Water Reserve
78%
Sensor Uptime
99.4%
Power consumption · 24h
kW · grid / solar / generator
System Health
composite SLA
Estate-level telemetry
11 estates · 248 sensors active
Sensor activity per hour (48h window)
Lekki Pearl
Abuja Hills
Ibeju City
PH Marina
Eko Bay
Kuje Heights
Calabar Greens
Enugu Pines
live
Power Substations
14 / 14
all nominal
live
Borehole Pumps
31 / 33
2 in service
live
Network Nodes
184 / 186
2 degraded
live
Active Alerts
6
1 critical · 5 minor
Infrastructure SLA per estate
Lekki Pearl · Phase 296%
Abuja Hills91%
Ibeju City · Phase 368% · construction
PH Marina84%
Eko Bay88%
Kuje Heights94%
Recent infrastructure events
12:42
Substation S-04 load spike resolved
Abuja Hills · auto-balanced
11:18
Borehole P-12 maintenance complete
Ibeju City · back online
09:55
Fiber loop reroute via N-014
PH Marina · 0 downtime
08:30
Perimeter camera C-218 firmware updated
Lekki Pearl
07:02
Solar array A-3 peak yield reached
Calabar Greens · 412 kWh